實驗室改造中應該注意哪些細節?

返回列表 來源(yuán): 發布日(rì)期: 2020.11.17
 任何現代實驗室的建設或改造都離不開設計和施工。的設計是(shì)順利施工的基礎,完美的(de)施(shī)工才能把設計圖紙付(fù)諸實施。那麽在(zài)實驗室改造中應該注意哪些細節呢?
Design and construction are indispensable to the construction or renovation of any modern laboratory. Professional design is the foundation of smooth construction. Only by perfect construction can the design drawings be put into practice. So what details should we pay attention to in the laboratory renovation?
1. 排水管道(dào)施工
1. Drainage Pipeline Construction
在建建築由(yóu)建築師提(tí)供設計方(fāng)案,然後根(gēn)據設計圖(tú)上標注的(de)位置和距離大小,預留隱蔽(bì)管道或懸掛(guà)管(guǎn)道(dào)用於建築(zhù)本身的施工。多年未(wèi)建或者已改建實驗室(shì)的,應當尋找取水、排水的水源,采用明渠(qú)、吊管施工。
The architect provides the design plan for the building under construction, and then reserves concealed pipes or suspended pipes for the construction of the building itself according to the locations and distance marked on the design drawing. If the laboratory has not been built or has been rebuilt for many years, water sources for water intake and drainage shall be sought, and open channels and hangers shall be used for construction.
2. 線路配(pèi)置(zhì)
2. Circuit configuration
多年未建或已改建為化驗室的地點:確定現有的電力幹線,以評估電力充足(zú)程度。如果有任何短缺,增加產能。在暗管或開管施工期間,須(xū)翻新或分隔。實驗(yàn)室中的大型分(fèn)析測試(shì)儀器(qì)和設備,特別是類似ICP光譜(pǔ)儀的儀器和設備,必(bì)須有專門的接地線(xiàn),以(yǐ)保護操作人員和設備的安全,屏蔽外部磁場對儀器的幹擾,穩定儀器的電氣零點。接地線必須預先預(yù)留
locationss that have not been built or converted into laboratories for many years: Determine existing power trunks to assess power adequacy. If there is any shortage, increase production capacity. During the construction of covert pipes or open pipes, renovation or segregation is required. Large analytical and testing instruments and equipment in laboratories, especially those similar to ICP spectrometers, must have special grounding wires to protect the safety of operators and equipment, shield the interference of external magnetic field on the instrument, and stabilize the electrical Zero of the instrument. The grounding wire must be reserved in advance.
3.排氣係統
3. Exhaust system
為建築師提供管道規劃的路線。討論提前設置管線井或預留孔。或者確認建築本身沒有管道井(如果有的話)。相反(fǎn),根據現場距(jù)離和地形(xíng)可以找到理想的排氣管(guǎn)道路徑。重新確認控(kòng)製方式(shì),計(jì)算風機的(de)排風量和風速。

Provide architects with pipeline planning routes. Discuss setting up pipeline wells or reserved holes in advance. Or confirm that the building itself does not have pipe wells (if any). On the contrary, the ideal exhaust pipe path can be found according to the site distance and terrain. Revalsidate the control mode and calculate the exhaust volume and wind speed of the fan.

昆(kūn)山昌瑞空調淨化技術有限公司,專注從事空氣過濾器(qì)係列產品(初(chū)/中/高效、化學(xué)過濾器(qì)等)、潔淨室淨化設備(拋棄式/可更換式/自動卷繞式過濾器、高效送風口、FFU高(gāo)效過濾器淨化機組)的研發、生產、銷售和售後。

Changrui Air Conditioning Purification Technology Co., Ltd. focuses on the R&D, production, sales and after-sales of air filter series products (primary/medium/high-efficiency, chemical filters, etc.) and clean room purification equipment (disposable/replaceable/automatic winding filters, high-efficiency air supply outlets, FFU high-efficiency filter purification units).